[Aviso importante de Seguridad] Se han detectado sitios web falsos de Qfinder Pro. Más información >

Describe the standard boot procedure for ES NAS.


Última fecha de modificación: 2018-03-02

After installing drives and other devices, connect the network and power cables. Next, remove the protective cover from the handle on the front panel's right side. There is a display on the front panel's right handle.

During startup, the numbers 1, 2, 3, 4, 5 will appear sequentially on the display to indicate the startup status of the controllers on the left and right. In the last startup stage, the system will perform a HDD self-test. During this time, the fan will run at full speed for approximately 2 seconds, and may produce a rather loud sound. This is normal behavior.

When the HDD self-test is complete, the front-panel display will show “00”. The four LED indicators on the bottom-left corner of the rear of the controllers will light up in green, indicating that startup is complete and both controllers are working normally.

For more information, please refer to Quick Setup Guide.

The front-panel display indicates the startup status.

¿Le ha resultado útil este artículo?

Gracias por sus comentarios.

Para obtener más ayuda, pregunte a otros usuarios y a los expertos de QNAP en la comunidad. Ir a la comunidad de QNAP

Díganos cómo podemos mejorar este artículo:

Si desea enviarnos más comentarios, inclúyalos a continuación.

Elija especificación

      Mostrar más Mostrar menos
      Este portal en otros países / regiones:
      open menu
      back to top