[ประกาศแจ้งเตือนความปลอดภัย] ตรวจพบเว็บไซต์ Qfinder Pro ปลอม เรียนรู้เพิ่มเติม >

Describe the standard boot procedure for ES NAS.


Last modified date: 2018-03-02

After installing drives and other devices, connect the network and power cables. Next, remove the protective cover from the handle on the front panel's right side. There is a display on the front panel's right handle.

During startup, the numbers 1, 2, 3, 4, 5 will appear sequentially on the display to indicate the startup status of the controllers on the left and right. In the last startup stage, the system will perform a HDD self-test. During this time, the fan will run at full speed for approximately 2 seconds, and may produce a rather loud sound. This is normal behavior.

When the HDD self-test is complete, the front-panel display will show “00”. The four LED indicators on the bottom-left corner of the rear of the controllers will light up in green, indicating that startup is complete and both controllers are working normally.

For more information, please refer to Quick Setup Guide.

The front-panel display indicates the startup status.

Was this article helpful?

Thank you for your feedback.

Please tell us how this article can be improved:

If you want to provide additional feedback, please include it below.

เลือกสเปค

      ดูเพิ่มเติม น้อยลง
      เลือกประเทศหรือภูมิภาคของคุณ
      open menu
      back to top