Why does HA failover/switchover disrupt SMB file operations on a HybridMount mounted folder?


Última fecha de modificación: 2025-06-30

Applicable Products

  • QuTS hero h5.3.0 or later
  • High Availability Manager
  • HybridMount

Cause

During a high-availability (HA) switchover or failover, HybridMount must restart and remount all remote connections. If a file read/write operation initiated from an SMB client is still in progress at the time of failover or switchover, the process will be interrupted, preventing the operation from completing.


Solution

Please restart any interrupted file operations from the SMB client after the failover or switchover process is complete.


Further Reading

What should I do if downloading stops after a failover or switchover?

¿Le ha resultado útil este artículo?

Gracias por sus comentarios.

Díganos cómo podemos mejorar este artículo:

Si desea enviarnos más comentarios, inclúyalos a continuación.

Elija especificación

      Mostrar más Mostrar menos

      Este portal en otros países / regiones:

      open menu
      back to top