Why does HA failover/switchover disrupt SMB file operations on a HybridMount mounted folder?


最終更新日: 2025-06-30

Applicable Products

  • QuTS hero h5.3.0 or later
  • High Availability Manager
  • HybridMount

Cause

During a high-availability (HA) switchover or failover, HybridMount must restart and remount all remote connections. If a file read/write operation initiated from an SMB client is still in progress at the time of failover or switchover, the process will be interrupted, preventing the operation from completing.


Solution

Please restart any interrupted file operations from the SMB client after the failover or switchover process is complete.


Further Reading

What should I do if downloading stops after a failover or switchover?

この記事は役に立ちましたか?

ご意見をいただき、ありがとうございます。

この記事の改善箇所をお知らせください。

その他のフィードバックがある場合は、以下に入力してください。

仕様を選択

      もっと見る 閉じる

      当ページを他の国/地域で見る:

      気軽にお問い合わせ! show inquiry button
      open menu
      back to top